Tags: HOT START UP AFBC BOILER, light up of afbc boiler, WARM In this article we discussed about the AFBC boiler hot startup and cold. The start up of fluidised bed combustion boilers has always been a subject of the most surface, it is advised not to proceed with the light up. Unless the top. Requirements of Bed material,Charcoal & Diesel. Bed material Maximum Particle size Bulk density Chemical composition MM TO

Author: Gojas Taubei
Country: French Guiana
Language: English (Spanish)
Genre: Technology
Published (Last): 20 March 2006
Pages: 186
PDF File Size: 4.37 Mb
ePub File Size: 4.20 Mb
ISBN: 399-4-84997-196-2
Downloads: 21626
Price: Free* [*Free Regsitration Required]
Uploader: Maugul

Afbc Boiler Operation Manual – ligyt operation manual at Boiler Installation – Afbc Documents. Light up all the four burners. Published on Oct View 3. Boiler Manual For Cfbc – boiler operation procedure?

Check the following valves are kept in open condition. After stabilisation of bed temperatures stop the burners and LDO pumps.

Check the following valves in boiler are in closed condition. Bed material to be filled and level of defluidised bed should be MM of WC.

TOP Related  MANISAN JAHE PDF

Inspect the boiler before start and check Manual on Boiler Tube Fluidized bed combustion – wikipedia, the free encyclopedia Fluidized bed combustion FBC is a combustion technology used to burn solid fuels. C and stable the boiler. Main steam stop and pilot valve. Feed pump and drives.

Afbc Boiler Light Up Procedure

Ensure all equipment trial to be taken. Initally the top bed temperature will raise and at the time of mixing temperature drops and bottom temperature raises at the time of mixing. A fixed quantity of diesel wetted Charcoal 40 Kgs is spread uniformly over the compartment. Cethar Afbc Boiler Manual – dire searching for a ebook Cethar afbc boiler manual in Ensure feed water flow through economiser at the time of light up to avoid steaming of economiser.

Inspect the boiler before start and check Manual on Boiler Tube Bhel steam generators products afbc boilers Tags: Ensure all personel were cleared. All interlocks to be cross checked.

Fuel feeders and controllers. Boiler light up procedure A fixed quantity of dry charcoal Kgs i.

TOP Related  IL PARTIGIANO JOHNNY FENOGLIO PDF

The pressure drop across bed is obtained for various air flow. Start up vent valve. Afbc Boiler Operation Manual – boiler operation procedure u; seminar afbc boiler operation procedure,Ask Latest information,Abstract,Report,Presentation free download cfbc Documents.

Keep the PA lines clear and take trial run of feeder of first compartment.

Afbc Boiler Light Up Procedure

Maintain drum level at normal libht level. Bed material Maximum Particle size Biler density Chemical composition: Set the air flow to MM of wc P. Ensure all foreign materials are removed from furnance and pressure parts.

The air flow at which fludisation starts is noted and will be maintained at the time of mixing. When the bed temperatures reaches Deg C start the drag chain coal feeder. Start the FD fan and maintain bed pressure mmwc. Cfbc boiler operation procedure?